Dyna
Torque Technologies Inc. recently completed projects
___________________________________________________________________________________
Client: Helix Energy Solutions
Project: Numerous projects in conjunction
with a welding equipment
contract for the pipelay vessel, Caesar
Upcoming Projects: Murphy
Oil/Thunder Hawk; Statoil/Noonan; BP Norge/Skarv
Project Descriptions: Offshore
Pipeline Projects in
Gulf of Mexico and North Sea
Contact Persons: Robert
van der Kooij;
___________________________________________________________________________________
Client:
Acute Technological Services/Shell
Project: Shell Perdido / Double
jointing
Pipe: 8.625 and 10.750
Project Description: Dyna Torque automated welding equipment
(Lonestar
system) was used by Acute Technological Services for development of
welding procedure, fatigue samples and double joint production.
Contact Persons: Timothy S. Thompson, Acute
Technological Services
___________________________________________________________________________________
Client: Acute
Technological Services/Exxon
Mobile
Project: Research Weld
Pipe: 30 .750 wt API X80
Project Description: Dyna Torque was subcontracted by Acute
Technological Services to provide automated welding equipment (LoneStar
Automated Welding System) for the benefit of Exxon Mobile in
development of a welding procedure for X80 pipe to be used on
onshore tie-in welds.
Contact Persons: Quentin Champ, Acute Technological
Services, Inc
and Gary Hoopes, Acute Technological Services, Inc.
___________________________________________________________________________________
Client:
Kiewit Offshore Services, Ltd./Acute
Technological Services/BP
Project: Inconel Procedures Development
Pipe: 8, 10 and 12 10.750 OD,
API 5LX70
Project Description: Dyna Torque provided procedures
development services in developing a total weld by running a GTAW
bead and hot pass and FCAW fills with Inconel 625 flux core wire.
Additionally, Dyna Torque is providing welding equipment for
completion of the project by Kiewit Offshore.
Contact Persons: Richard Marslender, Kiewit Offshore
Services, Ltd.
and Gary Hoopes, Acute Technological Services
___________________________________________________________________________________
Client: Dutch
Gasunie/Lastechniek Europa
Project: Attachment of sleeves to
existing gas pipelines
Pipe: various sizes
Project Description: Dyna Torque Technologies and
Lastechniek Europa provided procedures development services for
pipeline welding throughout
Holland
for onshore gas pipeline repairs. Scope of work included attaching
sleeves to existing pipelines using flux core longitudinal and
orbital welds and the Dyna Torque LoneStar Automated Welding
System.
Contact Person: Laurens van der Heijden,
Lastechniek Europa
___________________________________________________________________________________
Client:
Petrobras/Andrade
Gutierrez
Project: Coari Manaus Amazon Pipeline
Project
Pipe:
20 x
.438 pipe
Project Description: Dyna Torque provided procedures
development services, which included procedures development and
qualification, fatigue sample testing, pipe facing and automated
welding equipment and personnel. Dyna Torque utilized a GMAW
process with a copper backed clamp for the root and fill/cap
passes. Dyna Torque mobilized for welder training and
qualifications in July 2007 and immediately thereafter for
production of a 90 Km onshore pipeline located on the Amazon River.
Contact Persons: Manfred Richter, Petrobras Bob
Bates, AUT Consulting
___________________________________________________________________________________
Client: Williams Companies/Womble
Company
Project: Tahiti
Pipe: 10 x 1.125 wt and 16 x .688
wt pipe
Project Description: Welding project consisted of welding
hold-off collars and spool pieces to pipe utilizing an RMD process
for the root pass and the FCAW welding process for filing and
capping welds. Dyna Torque provided welding services in their new
facility including procedure development and qualification, pipe
facing, automated welding equipment and personnel.
Contact Persons: David Hernandez with Williams
Companies
or Mike Williams with RCI Consultants .
___________________________________________________________________________________
Client:
Williams Companies/Womble Company
Project:
Tahiti
Pipe: 16 line pipe x .688 wt to
buckle arrestor welds for Allseas USA, Inc.
Project Description: Dyna Torque provided turnkey welding
services including procedure development and qualification, pipe
facing, automated welding equipment and personnel. Dyna Torque
utilized an open root RMD process for the root pass and the FCAW
welding process for filling and capping the welds. This is the
first time an RMD root pass has been accomplished with an automated
system by Dyna Torque.
Contact Persons: David Hernandez with Wiliams
Companies or
Mike Williams with RCI Consultants .
___________________________________________________________________________________
Client: BP
p.l.c./Acute Technological Services, Inc. (contractor: Heerema
Group)
Project: Atlantis
Pipe: 10 and 16 pipe to forging, pipe
to hold-off collar, bulkhead transition, and
flex joint welds.
Project Description: Dyna Torque provided turnkey welding
services including procedure development and qualification, fatigue
sample testing, pipe facing equipment, automated welding equipment
and personnel. The root pass was completed by automatic GTAW and
remaining passes were completed utilizing a pulsing GMAW weld
process with the Dyna Torque LoneStar welding system.
Contact Persons: Mark
Devall, Acute Technological Services, Inc. Tim Burns (formerly
with Acute Technological Services ; Bob Bates, AUT Consulting, Inc.
(AUT auditor).
__________________________________________________________________________________
Dyna Torque Technologies
Inc. projects in 2004 and earlier.
Nov. 2004 - Dyna Torque
Technologies Inc. successfully completed pipeline welding onboard
the DP
vessel Midnight Express, a new addition to the Torch Offshore Inc.
fleet. This was a first pipe lay project for the DP vessel Midnight
Express.
 
Video clip shows typical welding
operation on welding station using Dyna Torque's
LoneStar
single head automated welding system. Dyna Torque Technologies Inc.
provided "turn-key" welding services including procedure development and
qualification, pipe facing, automated welding equipment and
personnel on the project.
Due to the small pipe diameter, only one
LoneStar orbital welding device
(bug) was used, which reduced overall costs of the welding operation. The 4" pipe laying
project was welded for Energy Partners Limited with a repair rate less
then1%.
Download Video Clip "Midnight Express - Welding Station 3" (low
resolution 2.6MB)
Download Video
Clip "Midnight Express - Welding Station 3" (high resolution 32.9MB)
July - Dec. 2004 -Dyna Torque
Technologies Inc. Successfully Completed Pipeline Welding on
Marathon Oil Company Alba Project, Punta Europa II, Terminal
Construction in E.G. Africa.
This project involved on-shore and off-shore welding. The offshore portion
of the job
was completed on the pipe lay barge Midnight Brave for Torch Offshore.
The job was completed with less than 1% repair rate:
Dyna Torque Technologies Inc.
provided "turn-key" welding services including procedure development and
qualification, pipe facing, manual and automated welding equipment
and personnel on the project..
- 24" .612" (X-70) Condensate Line
- 10" .331" (X-65) in 14" .500" (X-52) Pipe-in-Pipe Butane Export
Pipeline
- 10" .331" (X-65) in 14" .500" (X-52) Pipe-in-Pipe Butane
Recirculation Pipeline
- 12" .331" (X-65) in 16" .500" (X-52) Pipe-in-Pipe Butane Export
Pipeline
- 12" .331" (X-65) in 16" .500" (X-52) Pipe-in-Pipe Butane
Recirculation Pipeline

April 2004. Dyna Torque Technologies Inc.
successfully completed pipeline welding project at Torch Inc. spool
base in Dulac, LA for Ridgelake with less then 2% repair rate.
Dyna Torque Technologies Inc. provided "turn-key" welding
services that included procedure development and qualification, pipe facing,
manual and automated welding equipment and personnel.
-6" .435" (X-42) Flow-Line, 38,000 feet

March 2004. Dyna Torque Technologies Inc.
successfully completed pipeline welding project at Torch Inc. spool
base in Dulac, LA for Walter Oil & Gas Company with less then
3% repair rate. Dyna Torque Technologies Inc.
provided "turn-key" welding services that included procedure development and
qualification, pipe facing, manual and automated welding equipment
and personnel.
-4" .337" (X-56) Flow-Line, 54,000 feet
Download Video Clip "Spool Base
Dulac" (high resolution 25.1MB)
2003-2004 Dyna Torque Technologies Inc. was
involved with Bredero-Shaw in procedure development for BP
Thunderhorse project, flow-line and SCR's (8" 35mm and 38mm, 10"
38mm and 12" 35mm).
Dyna Torque Technologies, Inc.
provides a full line of pipe facing machines, internal line up
clamps (both pneumatic and hydraulic), manual line up clamps,
automatic welding equipment and a full range of consumables. We can
also provide operators, technicians and consultants for any project
or special need.
Dyna Torque
Technologies, Inc. provides the CWS, complete welding solution,
outsourcing for your entire pipeline project from welding specifications to project
execution.
At Dyna Torque,
we pride ourselves on job service and technical support.
Copyright©2001
Dyna Torque Technologies, Inc.
All Rights Reserved